CONSTRUCTION OF SAMSUN CITY PASS & SAMSUN-AZOT DISTRICT-UNYE MOTORWAYS KM: 9+400 - 29+040
Samsun Peripheral Motorway Construction is a project of approximately 20 km long. Within the scope of the project there are 3 interchanges and a viaduct of L:2657 meters. The project is a 2x2 peripheral motorway also connecting new side roads. Hot Bituminous Surface Coating technique is used.
Turkey’s longest spanned bridge with a length of 2657 m is also built as part of the project.
Client: General Directorate of Highways – Department of Programs & Monitoring
Location: Samsun - Turkey
Construction Period: 2 years