KABUL - KANDAHAR HIGHWAY MATERIAL PRODUCTION
The project was to screen and stockpile pit run or river run asphalt material to complete 25 cm of asphalt treated base for the Construction of the Kabul-Kandahar Road between km 92+000 and km: 432+000. For the successful completion of the project, five screening plants, each with a capacity of 200 tone/hrs have been erected in four different sites at 85 km intervals. The Project had been carried out by Gulsan Cukurova Joint Venture
İşveren : Louis Berger Group Inc.
Konum : Kabul-Kandahar Afghanistan
İnşaat Süresi : 2003 - 2003