UPGRADING of the MERILLE RIVER-MARSABIT ROAD, KENYA | GÜLSAN HOLDİNG

UPGRADING of the MERILLE RIVER-MARSABIT ROAD, KENYA (A2)

The project’s aim was to construct 122 km of the existing unimproved road route from Merille River to Marsabit, 500 km northeast of Nariobi, Kenya. The width of the road cross-section is 11 meters with 7 meters carriageway and 2 meters shoulders. The main items are earthworks, a cement stabilized base and sub-base, asphalt concrete wearing course, double surface treatment, composite bridges and viaducts, box and pipe culverts, and road furniture from road signs and markings to posts and guardrails.

Client: Ministry of Roads, Kenya
Location: Merille-Marsabit/Kenya
Construction Period: 3 years



Kenya'daki İlk Yol Müteahhidi haberi Yol Teknolojileri Dergisi'nde yayında.


       

PROJECT MAIN QUANTITIES

       
Earthworks Surface Treatment Bored Pile Concrete Works
2.820.000 m³ 1.342.000m² 4.430 mt 28.000 m³
       
Structural Steel Works Cement Stabilized Subbase Cement Stabilized Base AC Wearing Course
840 ton 330.000 m³ 300.000 m³ 45.000 m³
       