KANDAHAR - HERAT STATE HIGHWAY PROJECT II
The scope of the project was to reconstruct the section between km 406+000 and km: 456+000 of the mostly deteriorated Kabul-Herat Motorway, which is a part of the vastly damaged 3,300 km National Highway Network. The project was carried out by Gülsan Cukurova Joint Venture.
Client : Louis Berger Group Inc.
Location : Herat, Afghanistan
Construction Period : 2004-2005