CONSTRUCTION WORKS of MALATYA-ELAZIĞ STATE ROAD VELIPALAS LANDSLIDE
The project aims to construct the Malatya – Elazig state road through the Velipalas landslide area by building a reinforced cut and cover tunnel including piling works. The project includes 400.000m3 excavation, 25.000m bored piles, 45.000m3 concrete works.
Client: General Directorate of Highways, 8.Region Directorate / Elazig
Location: Malatya-Elazığ
Construction Period: 600 days